Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the newscard domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/hvsghcom/public_html/wp-includes/functions.php on line 6121
Aburi - Ayi Mensah highway opened temporarily to traffic - WhatsUp News

Aburi – Ayi Mensah highway opened temporarily to traffic

The Ghana Highway Authority (GHA) has temporarily opened the Accra bound carriageway from the Peduase Lodge to Ayi  Mensah on the Aburi – Accra road to vehicular traffic.

The Ghana Highway Authority closed that section of the road in October 2019 due to some slope failures and rock falls, with potential for further rock falls and slope failures.

Consequently, the Ayi Mensah to Aburi-bound double carriageway was been turned into a single carriageway to enable traffic flow to and from Aburi and beyond.

But in a press statement, the GHA said the road is being opened temporarily on Saturday December 28, 2019 for use during the festive season.

“The Ghana Highway Authority wishes to inform the general public, especially motorist using the Aburi Road that, the South-bound lane; Peduase to Ayi Mensah section which was closed to the public due to slopes failure is OPENED for use during this festive season from Saturday 28th December, 2019 to 30th January, 2020.”

“While we want to assure the Public that work is under way to ensure repair works begin soon on the Slopes, motorists are entreated to drive with caution and respect road regulations. We are counting on your usual Coorperation.”

Read also: Falling rocks force closure of section of Aburi-Accra road

more to follow…

graphic.com.gh

SUBSCRIBE NOW


Subscribe to our Newsletter today and join the millions that receive great tips and information from us.

 

This will close in 30 seconds